| |
November 22, 2005: BIRNS Lights Featured in New Institute of Nautical Archaeology Book. Read more.
October 31, 2005: BIRNS delivers cable assemblies to the University of Wisconsin’s Physical Sciences Laboratory for the IceCube Project. Read more.
September 15, 2005: BIRNS selected by the University of Wisconsin’s Physical Sciences Laboratory to supply cable assemblies for the IceCube Project. This program is an outgrowth of AMANDA (Antarctic Muon and Neutrino Detector Array), and will ultimately instrument 1 Km3 of ice at the South Pole. Read more.
September 9, 2005: BIRNS Delivers Class A High-voltage 3T Hybrid Electro-Optical Cable Assemblies, with two multimode optical fibers, eight 2.5Kv conductors, and four 600v conductors. EIA FOTP-171 testing showed optical losses <2dB @850nm. Read more.
August 1, 2005: BIRNS Develops Class A High-voltage 3T Hybrid Electro-optical Flanged Receptable connector. Read more.
- December 31, 2002: BIRNS Upgrades 3O Connector Class A Rating
October 15, 2001: BIRNS Develops Coaxial Connector
|