News
-
June 23, 2008: BIRNS develops and ships to Phoenix International first quick-disconnect high-voltage EOM (Electro-Opto-Mechanical) cable termination, with 3 single-mode fibers, 3 x 3.6Kv copper power lines, and 36,000 lb (16,400 Kg) mechanical strength member. Side-load capability tested to 7,000 lbs (3200 Kg).
-
October 12, 2007: BIRNS develops rugged ROV-mounted Model 7715 BIRNS Blackbirn II UV light and ballast.
November 22, 2005: BIRNS Lights Featured in New Institute of Nautical Archaeology Book. Read more.
October 31, 2005: BIRNS delivers cable assemblies to the University of Wisconsin’s Physical Sciences Laboratory for the IceCube Project. Read more.
September 15, 2005: BIRNS selected by the University of Wisconsin’s Physical Sciences Laboratory to supply cable assemblies for the IceCube Project. This program is an outgrowth of AMANDA (Antarctic Muon and Neutrino Detector Array), and will ultimately instrument 1 Km3 of ice at the South Pole. Read more.
September 9, 2005: BIRNS Delivers Class A High-voltage 3T Hybrid Electro-Optical Cable Assemblies, with two multimode optical fibers, eight 2.5Kv conductors, and four 600v conductors. EIA FOTP-171 testing showed optical losses <2dB @850nm. Read more.
August 1, 2005: BIRNS Develops Class A High-voltage 3T Hybrid Electro-optical Flanged Receptable connector. Read more.
- Read Archived Press Releases.
Exhibitions
-
We sincerely thank all of you who made
Underwater Intervention 2008 (January 29 - 31, 2008) such a great success for us! We are grateful for your support.
-
Underwater Intervention 2009: March 3 - 5, 2009 --
See us in booth 808 at the
Ernest N. Morial Convention Center, 900 Convention Center Blvd, New Orleans, LA 70130-1755 USA.
|